September 12, 2013

Christening of the Wyvern's Haunt

Introducing...

The Wyvern's Haunt

   With all construction finished, all items placed, and all computers operational the Wyvern's Haunt is complete.  It has taken 25 days to construct, covers 176 sq. ft., has 69 sq. ft. of shelve space, and 94 sq. ft. of bench space, and 48 outlets (before power strips).
   The space is dedicated to one of Gemfire's great 5th units, the Wyvern was powerful enough to have it's own theme song.

September 11, 2013

Basement construction, day 24

   Hung the remaining shelves now that their finish has been completed. These shelves serve as my dresser.  There are 3 shelves, each 30" long.  They are mounted to 2x4" studs that run floor to ceiling with standard 10" L shelving brackets.  I used these brackets because these shelves don't require a heavy load, and the L-brackets take very little space away of the shelve.
   Pictured is the entrance to my area. 

1 comment has been made.

From Suck n Fail

September 12, 2013 at 12:56 PM

Looks like everything is coming together nicely!

September 09, 2013

Basement construction, day 22

   I have one more shelve set the needs to be assembled.  In the back corner there is a three foot span after the main benches.  I have wood for this, and today I began getting it prepared.  There is the bench top, which needs to be cut, sanded, painted, and vanished.  Then there are three support 2x4".  These need to be cut, painted and installed with L-brackets.  Then there are the shelves, but those will wait for now.